SEEKING BENEFITS WITH QUALITY AND DEVELOPMENT WITH TECHNOLOGY
The customer's equipment received power harmonic interference, often reported error shutdown, after using AHF to restore normal
The customer's equipment received power harmonic interference, often reported error shutdown, after using AHF to restore normal
The customer's motor starts with increased reactive power, so that other equipment can not work properly, after using SVG PF reaches 0.99
The airport's LED lighting facilities generate a lot of harmonics that affect the airport's communication system, and with the use of AHF equipment THDi is less than 5%.
The power quality in the customer's area is extremely poor, causing the equipment to not operate properly. After using ASVG, PF reaches 0.99 and THDi is less than 5%.
The power quality in the customer's area is extremely poor, causing the equipment to not operate properly. After using ASVG, PF reaches 0.99 and THDi is less than 5%.
The reactive power in this power supply area is too large, leading to an increase in line loss, and the PF reaches 0.99 after using SVG
Since the commissioning of the photovoltaic, the monthly average power factor was low (below 0.5) and could not be met; after installation, the average power factor was above 0.96
The average power factor was only 0.63 before the use of SVG, and increased to 0.98 after the use of SVG.
AHF before the use of 3-13th harmonic content is high, after the use of the content is greatly reduced, the effective protection of the customer's equipment